ASSESS – DESIGN – IMPLEMENT
End-to-End Project Management
Phased Methodology Overview
- Assessment
- Design
- Implementation
- End-to-End Project Management
Assessment Phase
- Tasks
- Develop / Provide / Review Assessment SOW and Project Plan (MS Project)
- Interviews
- Space Plan Inspections
- Power & Mechanical Equipment Inspections & Functional
- Power and Cooling Load Study / Analysis
- I.T. Physical Inventory and Electrical Load Measurements (optional)
- Power Distribution System Review
- Cable Plant and Cable Management Review
- Determination of fail-over capabilities (Single Point Failure Analysis)
- Review of Maintenance Contracts / Service Records
- Energy Efficiency Review (“PEU”)
- Other tasks as defined
- Deliverables
- Project status briefings / reports
- Final Findings and Recommendations Report and Presentation
- Team Review and Prioritization Workshop
- Decision Support as needed
- Design / Engineering Phase Fixed-price Proposal (if requested)
Design Phase
- Tasks & Deliverables
- Develop / Provide Basis of Design Documentation
- Space Plan (MS Visio or equivalent)
- Primary and Backup Power Quality Systems Specification
- Product Evaluations and Specification including cut-sheets and Submittals
- Product Alternatives (if applicable)
- HVAC Design / Plan
- Fire Detection Suppression Design / Plan
- I.T. Enclosures / Containment Plan
- Energy Efficiency Plan / Features
- Monitoring and Controls Plan
- Redundancy Features and Operation
- Sourcing and Acquisition Recommendations / Plan
- Flooring, Structures, Surfaces Plan
- Detailed Budget Model
- Implementation Project Plan including Site Prep, Staging, Installation Schedule, Startup and Commissioning, Site Documentation and User Orientation
- Maintenance Optimization Plan and Budget
- Fixed Price Proposal for Plan-check, Permits and Implementation
Implementation Phase
- Tasks and Deliverables
- Finalize Submittal Package (Engr. Stamped Plans)
- Submit to City for Plan-check and Permits
- Submit for Fire Permit (if required)
- Incorporate required Inspections into Installation Plan / Schedule
- Kick-off Meeting
- Staging, Delivery of Products & Materials
- Execution per Approved Construction / Installation Plan, per Design Documents and Project Plan
- Manufacturer Startup and Testing (if applicable) and Commissioning
- Final Permits
- Organize Site Documentation and perform User Orientation Training